Highline Water Reclamation Facility
CivilN 38°15′ · W 104°36′

Highline Water Reclamation Facility

A 24-million-gallon-per-day reclamation plant kept fully operational during construction.

—Project record
Client
Southern Front Range Water Authority
Location
Pueblo, CO
Completed
2024
Contract value
$142M
Scale
24 MGD capacity
Duration
38 months
Delivery
CM at-risk
Sector
Civil
01The brief

The authority needed to nearly double treatment capacity without ever taking the existing plant offline. We built the new trains alongside live process, then cut over basin by basin on scheduled windows.

Every tie-in was rehearsed, permitted, and inspected before it happened. The plant never dropped below permit through 38 months of construction.

02Scope of work
  • Cast-in-place process structures and basins
  • Phased tie-ins to live treatment trains
  • Deep utility and yard piping
  • Blower and headworks buildings
  • SCADA and process integration
24 MGD
New capacity
Zero
Permit exceedances
100%
Uptime maintained
Highline Water Reclamation Facility — view 1
Highline Water Reclamation Facility — view 2
Highline Water Reclamation Facility — view 3