CivilN 38°15′ · W 104°36′
Highline Water Reclamation Facility
A 24-million-gallon-per-day reclamation plant kept fully operational during construction.
—Project record
- Client
- Southern Front Range Water Authority
- Location
- Pueblo, CO
- Completed
- 2024
- Contract value
- $142M
- Scale
- 24 MGD capacity
- Duration
- 38 months
- Delivery
- CM at-risk
- Sector
- Civil
01The brief
The authority needed to nearly double treatment capacity without ever taking the existing plant offline. We built the new trains alongside live process, then cut over basin by basin on scheduled windows.
Every tie-in was rehearsed, permitted, and inspected before it happened. The plant never dropped below permit through 38 months of construction.
02Scope of work
- Cast-in-place process structures and basins
- Phased tie-ins to live treatment trains
- Deep utility and yard piping
- Blower and headworks buildings
- SCADA and process integration
- 24 MGD
- New capacity
- Zero
- Permit exceedances
- 100%
- Uptime maintained
—Start the conversation
Have a project that has to be built right?
Tell us what you're planning. We'll bring a number you can trust and a team that holds it.
- Headquarters
- N 39°44′21″ · W 104°59′25″