IndustrialN 39°43′ · W 104°49′

Front Range Logistics Hub

A million-square-foot cross-dock distribution center delivered in 14 months.

—Project record
Client
Continental Freightways
Location
Aurora, CO
Completed
2023
Contract value
$96M
Scale
1,050,000 sq ft
Duration
14 months
Delivery
Design-build
Sector
Industrial
01The brief

A regional distribution operator needed a million square feet of cross-dock capacity online before peak season. We took the project design-build to compress the schedule and self-performed the tilt-up to control it.

Eighty-foot tilt panels went up in a 19-day cycle while the slab cured behind them. The building was weather-tight a full month ahead of the contract date.

02Scope of work
  • Mass grading across 62 acres
  • Self-performed concrete tilt-up, 312 panels
  • Super-flat slab for automated racking
  • Cross-dock with 180 dock positions
  • Heavy electrical service and yard utilities
1.05M
Square feet
30 days
Ahead of schedule
312
Tilt panels self-performed
Front Range Logistics Hub — view 1
Front Range Logistics Hub — view 2
Front Range Logistics Hub — view 3
—Start the conversation

Have a project that has to be built right?

Tell us what you're planning. We'll bring a number you can trust and a team that holds it.

Headquarters
N 39°44′21″ · W 104°59′25″